Placement Optimisation in a Lean Manufacturing Environment

Published:

February 20, 2008

Author:

Pierre Chatain, Europlacer Limited, Dorset, UK

Abstract:

Tier 2 and Tier 3 EMS companies face increasing pressure from competition in low-cost manufacturing countries to produce assembled boards at lower cost, with increased complexity and to tighter deadlines. They also face an increasing amount of high-mix, small-to-mediumvolume production runs. Even OEMs find it hard to predict what products they will be manufacturing in three to five years time, driving the need to invest in highly flexible production tools that will cater to their needs over the lifetime of the equipment. This paper examines methodologies for optimising the process, improving stock control and providing greater traceability using lean manufacturing techniques....

  • Download Placement Optimisation in a Lean Manufacturing Environment article
  • To read this article you need to have Adobe PDF installed

You must be a registered user to talk back to us.

 

Company Information:

Europlacer designs and manufactures a comprehensive range of highly flexible SMT pick and place equipment for the global electronics industry, with a network of distributors across the globe.

Poole Dorset, United Kingdom

Manufacturer

  • Phone +44 1202 266600
  • Fax +44 1202 266599

See Company Website »

Company Postings:

(9) products in the catalog

(1) technical library article

(190) news releases

  • Aug 20, 2024 - Thermal Interface Materials Drive Electronic Innovation | GPD Global
  • Aug 20, 2024 - Underfill Materials Dispensing in Electronics Manufacturing Applications | GPD Global
  • Jul 15, 2024 - Transforming LED Manufacturing: I.C.T Engineers Set Up Complete Production Line in Tajikistan | I.C.T ( Dongguan ICT Technology Co., Ltd. )
  • Jun 20, 2024 - Case study: Precise Coating on Electronic Hearing Devices | ASYMTEK Products | Nordson Electronics Solutions
  • Mar 19, 2024 - What is Underfill | GPD Global
  • Browse Technical Library »

Placement Optimisation in a Lean Manufacturing Environment article has been viewed 1135 times

See Your 2024 IPC Certification Training Schedule for Eptac

December 2024 Auction